| Products |
high efficiency leaking stoppage agent |
The product is a new high-tech products developed by our company,
itsfeature is quick setting and hardening, high minute strength and
canproduce micro expansion and can be used extensively in the
urgentleaking stoppage and repairs of
funnels,mines,culverts,waterpools,basements,roof coverings and
military projects,fit for use inlarge volume dry basis leaking
stoppage,high speed jet and anchoring aswell as special projects in
winter construction and water proof andleaking stoppage agent, etc.
Executive standards:Q/XBN06-2000 high efficiency leaking stoppage
Grade:leaking stoppage-10
Specific surface area:more than 500m2/kg
Coagulation time and net liquid strength:
| Coagulationtime(min) | Mortarcompression strength(MPa) | |||
| Initial coagulation | Final coagulation | 15min | 1h | 1d |
| 1-4 | 3-6 | ≥10 | ≥20 | ≥25 |
The cement is packed in two ways:paper cartoons and
packages.Whenpacked in cartoons,the net weight of each is
20kg(containing 10packages);damp pro of package is adopted in
packaging with a net weightof 25kg each,and not less than 98% of
the marked weight other forms ofpackaging ar to be decided by the
supply and requisitioning parties.Intransport and storage special
attention should be paid to guard againstdampness and not to be
mixed with other miscellaneous articles.Theperiod of storage cannot
be more than 3 months,if the time limit isexceeded,or is dampened
and caked,it can be used only after beingrechecked to see if it is
qualified.
1)Before using,cut the leaking point or seam into the shape of
bellmouthing or wedge, clear away the scraps and prepare suitable
tools andmeasuring instruments.
2)Put 1kg of the leaking stoppage into the pot,adding 0.30-0.36kg
ofwater, quickly mixing it into fluids. In winter construction warm
watershould be used,and in summer construction cold water is used.
Excessiveor lack of water all affects the construction quality. Too
much watermake the fluids too thin and reduces its strength while
the lack ofwater makes the fluids dry and hard,sample can be used
if the conditionspermit.
3)Quickly press the mixed thick fluid against the direction
ofleaking, until the thick fluid is hardened. Generally within 10
minuteswater leaking can be stopped,then apply mortar mixed with
expansiveagent or ordinary cement mortar to the surface and curing
for 3 days.
4)For the serious water-leaking seam,method of drainage is
adopted.First stop the upper seam and then the lower seam,and at
last stop thedrainage hole.
5)For large area leaking, find out the leaking point, first
stopleaking with the leaking stoppage king,then apply cement mortar
withexpansive agent.
6)Generally speaking,it is not suitable to use the powder directly
tostop leaking. Under urgent cirumstances(such as water pool or
cabinleaking),powder can be applied directly to the leaking point
or waterpit and press it with hands or feet until it is hardened.
7)The leaking stoppage can be very hot after water is put into
it,whenused in large volume,care should be taken to cool it and
preventsplitting and cracking.
8)If it is necessary to prolong construction period,retarding
agentcan be mixed.
See more products from this supplier.
Do you want to show products of your own company? Join FREE now!